Nieuws - Bosch Rexroth

The bridge over lock V is a historic drawbridge over the Wilhelminakanaal in Lieshout.
HydroPneuMotion has taken the hydraulic installation out of operation and then disconnected it. Within three weeks that the bridge was blocked, we overhauled, among other things, the hydraulic unit and the existing bridge and locking cylinder of the drawbridge. After the blocking period, our client transferred the operation of the bridge back to Rijkswaterstaat.

hydropneumotion sluis v project in beeld hydraulische installatie

Motion is our drive

hydropneumotion motion is our drive
en_GBEnglish